Build your bundlePick a ready-made set, or make your own
FLOWER FIELD - XL Mirror Rug BundleIncludes: DAISY - XL Mirror Rug Making Kit, SUNFLOWER - XL Mirror Rug Making Kit$156.00$208.00-25%
RED HOT - Woven Bag BundleIncludes: RED GINGHAM - Woven Tote Bag Kit, RED HEARTBREAKER - Woven Tote Bag Kit, Small Ergonomic Craft Scissors$57.50$83.00-31%
HEARTBREAKERS DUO - Woven Bag BundleIncludes: BLUSH HEARTBREAKER - Woven Tote Bag Kit, RED HEARTBREAKER - Woven Tote Bag Kit, Small Ergonomic Craft Scissors$63.00$83.00-24%
CAUGHT RED HANDED - Woven Bag BundleIncludes: RED GINGHAM - Woven Tote Bag Kit, RED HEARTBREAKER - Woven Tote Bag Kit, BLUSH HEARTBREAKER - Woven Tote Bag Kit, Pink & Red Wavey - Woven Tote Bag Kit, Small Ergonomic Craft Scissors$118.00$161.00-27%
SECRET GARDEN - Wall Art Craft BundleIncludes: ROSY GRAND BUTTERFLY - Wall Art 3D Puzzle Kit, SAGE MIDI MOTH - Wall Art 3D Puzzle Kit, AMBER PETITE BUTTERFLY - Wall Art 3D Puzzle Kit$28.80$41.00-30%
MYSTIQUE MEADOW - Wall Art Craft BundleIncludes: AZURE GRAND BUTTERFLY - Wall Art 3D Puzzle Kit, ATLAS MIDI MOTH - Wall Art 3D Puzzle Kit, SWALLOWTAIL PETITE BUTTERFLY - Wall Art 3D Puzzle Kit$28.80$41.00-30%
LEADING LADIES - Wall Art Craft BundleIncludes: BRONTE GRAND BUTTERFLY - Wall Art 3D Puzzle Kit, MARIE MIDI MOTH - Wall Art 3D Puzzle Kit, JULIET PETITE BUTTERFLY - Wall Art 3D Puzzle Kit$28.80$41.00-30%
THE GEO ILLO COLLECTION - Wall Art Craft BundleIncludes: TWILIGHT GRAND BUTTERFLY - Wall Art 3D Puzzle Kit, MIDSUMMER MIDI MOTH - Wall Art 3D Puzzle Kit, MIDNIGHT PETITE BUTTERFLY - Wall Art 3D Puzzle Kit$28.80$41.00-30%
You have another variant of this product in your wishlist
Product Info
Made for crafters, designed by crafters. Bubbly and soft, the Blossom Pink Craft Project Planner has a wide variety of specialised pages and is the perfect companion however you choose to create!
Why You'll Love This Planner:
Premium woven cover
Thoughtfully designed project spaces
Beautiful gold embossed artwork
Elastic closure to keep your thoughts safe
Perfect For:
Project planning and reflection
Craft project tracking
Creative sketching and note-taking
Scrapbooking
Measurements: A5 planner, 192 pages on 120 Gsm paper
What is the purpose of the Craft Project Planner?
Our Craft Project Planner can be used to organise craft projects of all kinds! From works-in-progress to finished pieces, there is space to plan, track and reflect on your creations. Made for multiple craft types, you can track the inspiration, design, time log and budget of any DIY project. With a handy reference section at the back of your journal, you'll have all the information you need in one place.
How many projects will fit in the Craft Project Planner?
There are 28 different projects spreads in the Craft Project Planner, with additional working space at the back. You can use as much or as little of the spreads for your projects as you desire.
Do I need to be a full-time crafter to enjoy the Craft Project Planner?
Of course not! The Craft Project Planner can be used by all crafters from total beginners to seasoned pros. It's up to you how detailed you'd like the planner to be, so use it however works best for you, whether crafting is your whole life or just a fraction of it.
Black Friday Shipping & Duties
📦 Black Friday: Whilst most orders will not face any shipping or dispatch delays, due to the high volume of orders during November and December, please allow an extra 5 days for your order to be dispatched.
Additionally, global carriers can face their own delays during the holiday period. Craft Club does everything it can to work with the carriers to get your parcel to you as fast as possible!
🇦🇺 Australia: Craft Club offers flat rate shipping of $8.95 for all kits. Regular shipping will take 3-5 days to arrive.
🇳🇿 New Zealand: All NZ orders have flat rate shipping of $12.95 NZD for Regular Shipping. Regular shipping will take 3-10 days to arrive.
🇺🇸 United States: US Flat Rate: $6.95 USD for Regular Shipping. Regular shipping will take 3-10 days to arrive.
🇬🇧 United Kingdom: We offer £5.95 for Regular Shipping. Regular shipping will take 5-10 days to arrive.
🇸🇬 Singapore: Singapore Flat Rate: $9.95 SGD for Regular Shipping. Regular shipping will take 5-10 days to arrive.
🇨🇦 Canada: Canada Flat Rate: $12.95 CAD for Regular Shipping. Regular shipping will take 5-10 days to arrive.
🇪🇺 Europe: Europe Flat Rate: €8.95 for Regular Shipping. Regular shipping will take 5-10 days to arrive.
📦 Tariffs and Duties: At Craft Club, we want to support our US customers, so we've decided to cover all tariffs for orders coming into the United States. If you have further questions, please reach out to our support team.
You have another variant of this product in your wishlist
Why You'll Love Your
Craft Project Planner
📖 Made By Crafters, For Crafters – Every page is thoughtfully designed around how you actually create, from first spark of an idea to finished piece.
🗂️ Everything in One Place – Specialised pages to plan, track and reflect on your projects, so no idea, list or little detail ever slips away.
🎨 Room to Dream & Sketch – Space to jot notes, sketch designs and capture inspiration the moment it strikes.
✨ Beautiful Enough to Treasure – A premium woven cover, embossed artwork and an elastic closure keep your thoughts safe in something that feels like a keepsake, not just a notebook.
🌱 Slow & Intentional Crafting – Slow down, get organised and enjoy the quiet calm of planning your next make.
We Ship Everywhere in the USA
Real-Time Tracking
24/7 Support
Unplug and Unwind
Disconnect from devices and reconnect with your creativity!
Your Weekly Reset Ritual
Start a project that helps you leave the week's stress behind.
Make Space for Yourself
Give yourself a reason to sit down, and tune out the chaos.
Skip The Guesswork
Unlimited support, no extra shopping. Enjoy all-in-one kits!
Trending Questions ↗
Are the inside pages of the different Craft Project Planner colours the same?
Yep! The only difference in the Craft Project Planners is the colours. We wanted to make something accessible for the crafters who like things bright and bubbly, and those who prefer a more subtle and natural look.
What's the difference between a Home Base Journal and a Satellite Journal?
The Home Base Journal has 192 of 148mm x 210mm pages, whereas the Satellite Journal contains 96 120mm x 170mm pages. The Satellite Journal is designed with daily errands in mind, a perfect size to conveniently carry with you. The Home Base Journal, being a more standard size, is designed with mindfulness and slowing down in mind - a place to organise those thoughts and neaten them up.
What is the purpose of the Craft Project Planner?
The purpose of the Craft Planner Journal is to organise your works-in-progress or plan some future projects. Each project spread allows you to note the inspiration, how long the project takes, the materials used, and so much more! With a handy reference section at the back, you'll have all the helpful information you need in one place.
Do I need to be a full-time crafter to enjoy the Craft Project Planner?
Of course not! The Craft Project Planner can be used by all crafters from total beginners to seasoned pros. It's up to you how detailed you'd like the planner to be, so use it however works best for you, whether crafting is your whole life or just a fraction of it.
What do the inside of the Home Base and Satellite Journals look like?
All pages in both the Home Base and Satellite Journal are dotted grids. This gives you the freedom to sketch, write, and play around as much as you'd like.
How many projects will fit in the Craft Project Planner?
There are 28 different projects spreads in the Craft Project Planner, with additional working space at the back. You can use as much or as little of the spreads for your projects as you desire.
Are the Home Base and Satellite Journals supposed to have internal pockets like the Craft Project Planner?
No, the Home Base and Satellite Journals aren't supposed to have internal pockets. We've kept these designs sleek and concise.
Is a journal a diary?
A journal isn't a diary, but its intentions are similar - to slow you down and reflect on your present. Where diaries tend to chronicle one's day-to-day life in order of events, journals are deeper spaces used to reflect on emotions, personal growth, and thoughts.
Can I junk journal with these?
You most certainly can junk journal with both the Home Base and Satellite Journals. The Craft Project Planner is a more structured journal with prompts and progress markers, but there is still room to add bits and bobs for your inspiration and materials!
What's the point of a journal?
A journal is a living record of your life. Whether you're using it to process emotions and thoughts, create goals and lists, preserve memories, or to note your own personal growth. A journal is all yours to make your own, however that looks for you.
Customer Reviews
Overall rating: 4.8 / 5 from 35 reviews.
Literally the most functional and helpful journal/planner I’ve ever had. A great balance between structured and freeform workspaces. Handy guides and measurement tools. I finally have a place to organise, plan and document all my half-finished projects!
I love my journal! I use it to plan all my creative projects for my business! And it’s a great way to keep up with hobbies too. It’s changed the way I see projects and helps my little neurodivergent brain!
Excellent diary, with the reminders I need. Takes the guess work out of a repeat project and helps me match yarn and hooks. It’s also becoming my brag book 😁
i use my planner every day!! helps me keep track of all of my extra yarn/supplies, making it easier for me to know versus going through my boxes. plus there’s cute little stickers & so much more that makes the journal extremely useful!
honestly this was such a good purchase - i use this all the time and it makes my crafts feel like more of an accomplishment because i can track my progress somewhere concrete
I really liked the detailed sections in this journal. Also, it’s pretty high quality. The cover feels luxurious and I like the little charms. In the back there are some additional resources. I like those a lot too. It’s a really good journal for any type A crafter.
Love the way this planner is set out. I plan all my future goals and inspirations. I'm also loving the swatch pages, as I can see at a glance what I have hiding in my craft room.
I was hoping that the reference section would have more information- for example, there is a list of crochet terms in the US and UK/AU acronyms- but it doesn't say how to do those crochet stitches. Sometimes when I'm doing a project I'll have to look up which series of loops is which, and I know what the acronym stands for- but I was hoping to have the information of HOW the stitch is done as a reference in the book. You can still write that information in yourself- I was just
hoping that the crochet stitches would also be shown like the image has for embroidery stitches.
I was also hoping the reference section would have a table of information on different fabrics- like wool vs cotton vs acrylic.
I do wish there were more blank / dotted pages but you need to buy the other journals like the orbital journal so you can add paper in.
Overall there weren't any obvious defects in the journal I received. This wasn't a gift, it was a purchase. The quality is fine, I just think it requires an additional note book for project ideas- I don't think I've ever created something that the notes only took 2 A5 pages to come to fruition from planning, especially not for making a pattern.
This is an amazing planner! I tried to make my own version using a blank notebook this size but the sheer amount of info in here makes mine a pale imitation. I had considered returning this to save the money but after receiving it I love it too much to send it back—can’t wait to start using it!!! It’s the only crafting planner I’ve found that accommodates all kinds of crafts rather than just crochet or knitting (I do embroidery but also other things like nail art, miniature construction, painting/mixed media, etc). This planner is great! Just buy it!
I LOVE craft journal. The quality is excellent and the way it is set up is great for saving all the information on my project in one place rather than all over my desk. I would say it’s an essential crafter’s journal to help keep us organised.
I absolutely love how this journal makes me more mindful of my projects. I tend to rush to complete them, lose track, or abandon them completely. I love how I can slow down, take notes, and have a cute way to track my progress. I can’t wait to catalog my supplies in the inventory pages!
I should have read the description better because it just wasn't what I expected. It is not something I will ever use and the front of it was scratched up when it arrived. I saw from the reviews that others loved it but it is just not for me! I will donate mine to someone who will find it useful.
Beautifully designed and executed! I highly recommend this item. I’m excited to use this for future project planning - I have a bunch of fully- and half-formed ideas rattling around in my brain and I bought this so I don’t lose track of any of them. May buy another for my crafty best friend for Christmas!
Such a great crafting journal with plenty of room to write down ideas and plan and track projects as well as keeping track of supplies. This journal totally exceeded my expectations. I love it!
It's very very cute and I am very thankful for the reference pages in the back!! It's also set up so I can track/plan multiple different kinds of craft projects which is great for those of us who keep buying Craft Club kits to try out new crafts 💖